How it works

From the architect’s PDF to an awarded package.

Five stages, each with one job. Here is what happens in each, what the software does, and what it deliberately leaves to a person.

01 · Drawings

You drop every PDF in the revision — architectural, electrical, hydraulic, schedules. The set is staged before anything uploads, because a partial set is the expensive mistake: a missing sheet is a missing quantity, and nobody notices until a subcontractor prices 86 power points on a job that has 140. Extraction runs on the whole set at once, and files are content-addressed so the same set uploaded twice is not duplicated.

02 · Takeoff

Every quantity the extraction found, with the sheet it came from, the verbatim text it was read from, and the model’s own confidence. The doubtful ones surface first. Open any line and the drawing opens in the app at that page with every counted symbol highlighted — so a 45% reading gets checked against the plan in seconds, not hunted through 40 sheets.

Then you decide: that’s right, or here is what it should say. A decision is recorded against your name and the line becomes something a subcontractor can price. The raw extraction is never overwritten — what the model read and what you confirmed both stay on the record.

03 · Subcontractors

Confirmed lines group into trade packages. For each, you pick who should price it from your own directory — with their history with you, licence and win rate visible at the moment of choosing — or add a new firm. Each subcontractor gets a private link and the drawing set. They do not need to create an account to quote; the link is the credential.

04 · Compare & award

Every quote maps to the same confirmed lines, so the columns genuinely compare. A subcontractor who won’t cover a line excludes it with a reason, and the comparison shows that as an exclusion — never as a smaller number. “Lowest complete” only ranks bidders who priced everything, because a bidder who left work out is not cheaper.

Awarding is a project manager’s decision. It commits the money, rejects the losing quotes in the same transaction, and is written to the audit log.

05 · Variations

After award, a subcontractor can raise an extra against the original lines — a drawing clash, a code requirement, a client change. It arrives as pending, visible to both sides, and becomes committed cost only when a project manager approves it. The cost position always shows awarded, approved and pending as three separate numbers.

Who can do what

  • Project manager — runs a job end to end: takeoff, tender, award, variations.
  • Admin — all of that, plus the company’s details and team.
  • Subcontractor — not a member of your company. Sees only the projects they were invited to and accepted, prices from a link, and can raise extras on packages they have won.