For builders and their subcontractors

Drawings in. Priced trade packages out.

TenderField reads the architect’s set, shows you every quantity it found and where it found it, and turns what you confirm into tenders your subcontractors price on one link. Then it puts the quotes side by side — honestly.

752 High Street · 18-apartment fitout6 sheets parsed · closes Fri 25 Sept, 5pm
COMMITTED$129,850
Line item · from drawingsKirra Electrical Best value38/38 lines · 3wk leadNexa Power 2 exclusions34/38 lines · 2wk leadBrightline Complete38/38 lines · 6wk lead
Double GPO @ 300mm above FFL
86 ea · A.204
$11,180$12,040$11,620
25mm recessed downlight
216 ea · E.101
$36,720excluded
fittings by others
$34,560
Total ex GST$128,400$117,850$131,200
One pipeline

Five stages. The same five, on every job.

Nothing to configure and nothing to learn twice. A project moves left to right, and the stage strip tells you where it’s stuck and on whom.

01Drawings

Drop the architect's whole set. Extraction won't run on a partial one — a missing sheet is a missing quantity.

02Takeoff

Every line with its sheet, source text and confidence. Open the drawing at the exact symbol and confirm or rewrite.

03Subcontractors

Pick who prices each trade. Each gets a private link and the drawings — no account to create first.

04Compare & award

Every quote maps to the same confirmed lines, so columns compare. Exclusions show as exclusions, never as a lower number.

05Variations

Extras after award come back through you. Nothing is committed cost until a project manager approves it.

Why it can be trusted

Automated where that’s safe. Human where it isn’t.

The human gate

Nothing is priced until a person says the reading is right.

Every extracted line carries its sheet, its source text and the model’s own confidence. Open the drawing at the highlighted symbols, confirm or rewrite, and the decision is on the record with a name against it. The extraction itself is never overwritten.

Comparable quotes

A bidder who left work out is not the cheapest.

Every subcontractor prices the same confirmed lines, so the columns actually compare. An exclusion is shown as an exclusion with its reason — and “lowest complete” only ranks bidders who priced everything.

Committed means approved

Extras after award go through you.

A subcontractor raises a variation against the original lines. It sits as pending, visible to both sides, and becomes committed cost only when a project manager approves it.

Ready to see it on one of your jobs?

Accounts are set up by our team, not a sign-up form. Tell us about your business and we’ll get you started on a real drawing set.

Talk to sales